• Vehicles • Fashion • Recipes • Blogs • Hunt • Travels • Sport • Fun • Handmade • IT • Education
Mini-Games
x

x
zakruti.com » Auto & Vehicles » Video about Trains
CABVIEW Novi Sad - Beograd - Novi Sad 200km/h - IC train 551/552 - Stadler KISS - dulevoz

CABVIEW Novi Sad - Beograd - Novi Sad 200km/h - IC train 551/552 - Stadler KISS - dulevoz

FBTwitterReddit

video description

Rating: 4.5; Vote: 2
Railway line Beograd - Novi Sad has undergone significant changes compared to the previously recorded cabviews. In some places, a completely new route was built, some line curves have been ironed out and the old single-track line became double-track line. It is the first railway line in Serbia for train speeds up to 200km/h. This cabview was recorded from IC trains starting from Novi Sad to Belgrade and then in the opposite direction from Belgrade to Novi Sad. The first part of the video from Novi Sad to the south is very picturesque because of the beautiful colors of scenery twilight and the surrounding city evening lights. The video was taken from the new Serbian Railways Stadler KISS EMU train. The first part recorded from IC train 551 (Novi Sad - Beograd Centar) and the second part from IC train 552 (Beograd Centar - Novi Sad. These trains did not have any stops during the filming. The ride starts at upgrated part of station Novi Sad. The maximum allowed speeds are: 100km/h and 120km/h from Novi Sad to Petrovaradin, 160km/h from Petrovaradin to Sremski Karlovci and Karlova-ki Vinogradi, 200km/h from Karlovacki Vinogradi to Batajnica (41km of line, over -ortanovci, Be-ka, In-ija, Stara Pazova and Nova Pazova, 120km/h from Batajnica to Novi Beograd and 100km/h from Novi Beograd to Beograd Centar. Timestamps for 200km/h ride are 09: 40 and 48: 10 in the opposite direction. Train ride and engine driver are controlled by ETCS level 2 (European Train Control System. Movement authority and other signal aspects are displayed in the cab for the train driver. Train movements are monitored continually by the radio block centre using trackside-derived information. The movement authority is transmitted to the vehicle continuously via GSM-R or GPRS together with speed information and route data. The on-board computer continuously monitors the transferred data and shows the maximum permissible speed. During this recording there were no significant restrictions or obstacles along the track and the train was running at the maximum allowed speed on each part of the line most of the time. The most important objects along the railway line are: 03: 56 Bridge over the Danube River (-e-eljev most) ( L = 474m ) 10: 10 Bridge -ortanovci ( L = 2806m one track and L = 2861m another track ) 11: 00 Tunnel -ortanovci ( L = 1156m one track and L = 1087m another track ) 28: 35 Tunnel Be-anijska kosa ( L = 1921m ) 31: 15 Bridge Novi -eleznicki most ( L = 1928m ) The most impressive are new railway viaducts and tunnels -ortanovci, over the slopes of mountain Fruska Gora
Date: 2022-05-17

Comments and reviews: 6


Awesome! Everything is perfect. Danube is beautiful near the railroad. Why the first switches from Novi Sad are still mechanically actuated? 13: 45 - Axle temperature & vibration measuring system? 35: 15 - Good night! :)
reply

Nice to see that the line has been build (in only a few years! It even has ETCS, though I wonder if you won't miss any of the signals at 200 km/h. 30 minutes to travel around 80 kilometers is very modern!
reply

Reminds on Shinkasen or TGV. :) Finally. Connecting people and cutting the traveling time - both cities and the region will see the economic benefit. Congrats!
reply

da li ima neka skica za dugmice u flirtu ili mozes da mi objasnis npr sta znaci kada semafori trepte zuto ili zeleno
reply

Da li mozes snimiti voznju iz kabine na relaciji Subotica - Senta - Kikinda ili Subotica - Senta - Zrenjanin? pozdrav
reply

What a gorgeous route, i would like it if this route comes in TSW 2.
Drives here also cargo over it?

reply
Add a review, comment






Other channel videos